Solar trains: what are they and how do they work?

Solar trains: what are they and how do they work?

My list

Author | M. Martínez Euklidiadas

With the exception of walking and cycling, trains are the most efficient and sustainable form of transport. The good news is that around 75% of them across the world have been electrified, while 25% still use fuels. The bad news is that even electric locomotives use a partially polluting mix. Are solar trains feasible?

How do solar trains work?

A solar train is an electric train that obtains the energy required for its movement from photovoltaic cells located on their roof or next to the railway lines. In practice, there are hardly any solar train projects in the world, given the numerous technical complications involved in feeding such a large (yet efficient) object with solar power. Which on the other hand is perfect for moving small objects, such as compression waste bins.

Are there any solar trains in operation?

Train and solar panels.

In 2012, and as part of China’s 12th Five-Year Plan, the region of Shenzhen, drew up a plan to electricity dozens of public infrastructures using solar panels and which would include railway stations. In 2010, leading trade publications praised the connection of a small network of 20,000 solar photovoltaic panels with a production capacity of 6.68 MW to what, at the time, was the new station of Hongqiao on the high-speed line that joins Peking and Shanghai.

After this deployment came the desire to use the consumption of these railway stations as a ‘beachhead’ of the solar-powered trains, with the aim of jumping within a few years or decades to the direct electrification of trains. Although this journey will take a few decades.

Aldershot railway

The first 100% solar train in the world is a train that is now over 70 years old and used as a tourist attraction in New South Wales, Australia. Refurbished in 2017, the firm North Byron Resort installed solar panels on its roof, which supply the train with 6.6 kW of power. It is sufficient for the train to cover the 3-km journey between the North Beach and Byron Beach stations at a ridiculously low speed (18 km/h), which is ideal for leisure.

Solar trains in India

That same year, India announced an ambitious national plan aimed at reducing its dependence on a highly polluting electricity mix. Backed by the country’s Ministry of Science and Technology, a large part of its electric fleet incorporates solar panels on the roof of the trains that are sufficient to supply around 15% of the energy required during the journey.

Can trains be powered solely with solar energy?

Despite barely touching the rails, a train is an extremely large vehicle. This means that it takes a great deal of energy to make it move and although the amount required to keep it moving is lower (except on steep gradients), it is still a significant amount.

A high-speed passenger train can consume around 0.03 kWh per passenger and kilometer, which, for a 600-passenger train, is a total of 18 kWh/km. At a speed of 250 km/h, one kilometer is covered every 14.4 seconds and therefore around 3.6 MW are consumed.

With a generation of 200 W per square meter, 18,000 m2 of photovoltaic panels would need to be installed next to the railway line in order to provide sufficient momentum for all the energy used by the train to be electric. From a technical point of view, it is a feasible challenge, but the implementation of this infrastructure and its use on a circuit that could have various trains running, make operating strictly solar trains today just a theory.

Images | iStock/Russian Labo, PxHere

Related Posts

Recommended profiles for you

KI
Kazuhiro Ikeda
SEI ANtech-Europe GmbH
Research and Innovation
RF
Rafael Fando-Mestre
Ferrovial Corporación S.A.
ITS/Mobility Manager
CJ
Carlos Jonguitud
UNAM
Internationalist UNAM. #BIVAUniversitario. National and Foreign Policies, Mobility, Stock Market
JG
Javier Gutierrez
Cegeka
Product Manager
AS
André Souta
Ubiwhere
Business Manager
RJ
Rui José
University of Minho
Our mission is to create and disseminate new knowledge on how to explore the disruptive potential of
AL
Alice Lerch
Berlin Partner für Wirtschaft und Technologie GmbH
Project Manager Communications at Berlin Agency for Electromobility eMO
KH
Kimmo Hanhinen
Rolan Oy
Ceo
JG
Javier García López
Engineer
Management Industry Engineer
AB
Amnon Bouthz
Yehud Monson Municipality
Director
MB
Mahtab Baghaiepoor
Smart City Commission at Yazd City Council
Consultant
JF
Juan Manuel Freire Iglesias
Ferrovial
Head of Scientific Affairs
RR
Rob Rae
Littus
Managing Director
JG
Johan Gachon
ITS4YOU
Owner
WG
Wulf Gesine
DILAX
Sen. Communications Manager
GC
Guillermo Calderon
GOAL SYSTEMS
Eastern Europe Sales Director
DG
Daniel Gil Rosón
360 Smart Minds
BDM & Project Manager
IS
Iman Sulaeman
Djava Transmedia
CEO/Founder
GE
Gerard Espinet
Movi by Mobike
Head of Strategy & Operations, Southern Europe at Movi by Mobike
XL
XAVIER LAOS
UPC
ACADEMIC CHIEF